Skip to main content

Time Control — Implementation Stages

Implementing the Belina Time Control Module involves a structured process across eight stages. Following these stages ensures a smooth rollout for both administrators and employees.


Stage 1 — Planning & Assessment​

Identify the following before any installation begins:

  • A suitable candidate to act as System Administrator
  • The organisation's existing time controls and attendance methods
  • Areas where strengthened timekeeping can benefit the organisation
  • Reporting requirements — what data management needs to see

Stage 2 — Terminal Positioning & Mounting​

Determine and set up the physical locations for the time control terminals:

  • Identify entry/exit points and high-traffic areas
  • Mount terminals at an appropriate height for fingerprint or facial recognition
  • Ensure terminals are connected to the network or have flash drive access

Stage 3 — Software Installation & Administrator Training​

Install the Belina Time Control Module on the computer that will control the terminals.

Train the System Administrator on:

  • Introduction to Belina Payroll HR software
  • How to capture employee names and details into the system
  • Setting up Slots, Shifts and Rotations and applying them to each employee
info

After training, the administrator continues capturing the remaining employees into the Time Control Module independently.


Stage 4 — Fingerprint / Facial Capture & Employee Training​

Once employee names are captured, the synchronisation procedure transfers employee details to the terminal(s).

  • Capture biometric records — fingerprints and/or facial recognition for each employee
  • Train employees on how to log in at the terminal
  • Test that all employees can successfully clock in and out
tip

The duration of the familiarisation process depends on how quickly employees adapt to using the new system. Allow sufficient time for this stage.

The administrator continues capturing all remaining employees while employees begin clocking to build familiarity with the system.


Stage 5 — Data Download & Review​

Begin downloading terminal data from the terminal(s) into the Belina Time Control Module — via network connection or flash drive (memory stick).

During this stage:

  • Run the Calculation Routine
  • Start viewing and reviewing reports
  • Identify employees who are struggling with the login procedure and provide further training
  • Adjust Slots, Shifts and Rotations where necessary
  • Process time adjustments — including filling in any missing clockings
  • Obtain approvals for overtime, leave and other entries

Stage 6 — Exports & Reporting​

Once data is accurate and approved:

  • Export times to Excel or directly into the Payroll Module for further processing
  • Print summaries for management review
  • Email reports to line managers and others who require access to time information

Stage 7 — Payroll Processing & Period Close​

With time data exported and verified:

  • Process Payroll using the exported time data
  • Take a Backup of all data
  • Perform the Period End procedure to prepare for the next period

Stage 8 — Handover & Ongoing Support​

The system is handed over to the client. The organisation now runs the system independently, with access to:


Summary​

StageActivity
1Planning — identify administrator, assess existing controls, define reporting needs
2Terminal positioning and mounting
3Software installation and administrator training
4Biometric capture, employee training and testing
5Data download, calculation, review and adjustments
6Exports and reporting
7Payroll processing, backup and period end
8Client handover and ongoing support

Next Steps​


Version: 3.0 | Last Updated: May 2026

Was this page helpful?